Project Jupiter · Synergy VPP
How Western Power, Synergy and the microgrid talk to each other
Western Power sets the network limits. Synergy turns them into VPP dispatch. The microgrid edge controller is the only thing Synergy talks to, and it decides how the site meets the request. Step through the flow below.
- Network limits (DOEs)
- VPP event schedule
- Local setpoints
- Telemetry
- Boundary meter data
- Market bids and dispatch
- Certificates and identity
Under IEEE 2030.5 the controller is the client and polls Synergy’s server, so downward flows are the replies to those polls. The animation shows the direction of the information, not who opens the connection.
Specified by Synergy
- Northbound interface: CSIP-Aus (SA-TS 5573) plus Synergy’s storage extensions
- Reporting of state of charge, availability and capacity
- Security: mutual TLS, X.509 certificates, cybersecurity attestation
- Sandbox conformance testing before whitelisting for live dispatch
Left to the microgrid
- Internal hardware: PLCs, industrial PCs, edge servers
- Southbound protocols to batteries, inverters and chargers
- Internal dispatch logic, provided the boundary output meets the VPP command and Western Power’s limits
Getting the documents
- No public API or developer portal. Documents come through Synergy’s DER Industry Resources portal for technology providers
- Integration contact: der-support@synergy.net.au
- Also needed: SA-TS 5573 from Standards Australia and the Western Power Technical Rules and DER Functionality Requirements
Source reliability. This page summarises the Synergy VPP Edge Controller Integration Report, which draws on seven documents that read as AI assistant answers, not Synergy’s own material. Payloads are plain-language sketches, not Synergy’s schema. Verify the storage extensions, conformance tests and portal contact against the Synergy DER Industry Resources portal before relying on them. The 1 MW / 7 MWh* figures are the Element 47 base case, where 7 MWh is usable energy.