7 MWh* battery over one day

A battery that is full at 06:00 powers a truck charging cluster that is in use part of the time between 06:00 and 23:00, helped by a small solar array. It must be full again at 16:00, when it starts discharging to the grid for seven hours, to 23:00, for the Reserve Capacity Mechanism and grid support. Overnight it recharges from the grid, limited by the connection, ready for 06:00.

*7 MWh is the usable energy in the battery. A battery with 7 MWh usable needs to be sized at at least 8.5 MWh.

Zoom the battery axis

Battery energy

  • With top-up
  • Without top-up
  • Held for RCM and grid support
  • Overnight recharge

Power in and out

  • Charging Station Cluster
  • Solar Array
  • Top-up
  • Grid import, overnight
  • Grid import limit

The charging stations run through the day, 06:00 to 23:00. After 16:00 their load comes from grid import, solar and the genset, or from the battery if you choose that above.

Show the numbers

Model: one-minute steps from 06:00 to 06:00 the next morning. Solar is a half-sine from 06:00 to 18:00 or a flat rated output. The top-up delivers 95% of its rated power to the battery, starts as late as possible and ends at 16:00 with the battery full. The overnight recharge starts at 23:00, runs at the import limit and delivers 95% of the grid power to the battery. The charging stations are off after 23:00. Battery losses are otherwise ignored. These are illustrative figures, not a design.

*7 MWh is the usable energy in the battery. A battery with 7 MWh usable needs to be sized at at least 8.5 MWh.

Note: overnight grid charging and network tariffs

Charging the battery between 23:00 and 06:00 gets the cheapest energy rates, but it does not remove the network charge for holding a 1 MW connection. This note was checked against published tariffs, and it replaces an earlier draft that overstated how much of the demand charge an overnight draw avoids.

  • Energy price. Overnight energy falls in the off-peak period. For scale, Synergy’s Business Time of Use (R1) tariff charges 12.6 cents per kWh off-peak (10 pm to 8 am weekdays and all weekend) and 42.0 cents per kWh peak (8 am to 10 pm), at 1 July 2025 prices. R1 is limited to businesses using under 50,000 kWh a year, so it does not apply to a 1 MW site. A site this size buys energy on a negotiated retail contract, and the rates have not been confirmed.
  • Demand charges are not limited to peak hours. Western Power’s large-connection tariffs (RT5 to RT8, for connections of 1,000 to 7,000 kVA) include a charge based on the connection’s highest half-hourly demand over the previous 12 months, in kVA. An overnight 1 MW draw would set that maximum. The 8 am to 10 pm peak window is Synergy’s retail window, not Western Power’s.
  • On-peak window. Western Power’s 2024/25 price list gives the RT6 on-peak period as 3 pm to 9 pm on weekdays. Whether a window like this reduces any part of the charge for this site depends on the tariff it is assigned to and needs checking against the current price list.
  • Declared capacity. Western Power’s price list also sets an excess network usage charge when demand goes above the connection’s nominated capacity (DSOC), so the capacity chosen for the connection affects the bill whatever time of day it is used.
  • Not confirmed. A “minimum chargeable demand” floor and an “R3” Synergy tariff did not appear in the sources checked.

Sources: Synergy Business Time of Use (R1) tariff; Western Power price lists for 2024/25 and 2026/27 on the ERA website. Prices and tariff assignment need confirming with Western Power and a retailer.